Sunday, 14 November 2010

Link motion reassembled and tested Sunday 14/11/2010. Changes to main steam pipe to remove severe bends appears to be sucessful with better power to prop shaft at all steam pressures, further reduction planned to remove excess length in main steam flexible hose. Boiler steamed for 1hour 30 minutes. Boiler saftey valve lifted at 110 psi, sealed at 95 psi, boiler blown down and refilled twice. Engine much quieter, but identification of major knock associated with big end bearing, need to strip remetal/remachine, one set of nuts 1 1/8 in whit, other not yet known.

Friday, 12 November 2010

Link motion dropped to fix die block. Die block found to have four sacrificial brasses, fixed by 2BA brass countersunk screws. Brasses replaced and new screws from MaccModels. New w brasses 1/8 inch think and have removed 3/32 inch spaces in the link motion. Link to be assembled and tested w/e Nov 13, 2010.
Boat at Hoo Mill for boiler washout and some general engine room work. Inside of the boat progressing well but not finished yet.